Epoxy Damp Proof Membrane 5kg Reviews

4.9 Rating 21 Reviews
Read Permagard Reviews

Liquid Epoxy Damp Proof Membrane - 5kg
This Epoxy DPM is a two-component, solvent-free, low odour epoxy resin membrane that is tolerant of residual moisture in concrete floors. This enables earlier access onto the floor for the application of screeds, coatings and other floor coverings including tiles, vinyl, wood and carpets. Our epoxy DPM has good chemical resistance to mild chemical attack, but is designed to be over-coated with other resin finishes.
The Epoxy DPM 5kg is supplied in two 2.5kg multi chamber bags. This allows for the full 5kg or just half to be mixed at once depending on the area to be covered.
Our Epoxy DPM can be used on concrete floors and fine concrete screeds, of not less than 50mm thick in the case of un-bonded screeds. The surface should be of sufficient quality and mechanical strength to ensure an even coating.
The product can also be applied to polymers, screeds and certain types of smoothing under-layments, as long as these are well bonded. These under-layments must be stable to the effects of water. If not, then the concrete floor must contain an integral damp. proof membrane to prevent further ingress of water from the ground.
If you are laying the epoxy onto a concrete surface with an ineffective damp proof membrane or where there isn't one at all, you need to consider the possibility of hydrostatic pressure. By creating a barrier layer, you will direct the pressure/water flow elsewhere.
If you have a large epoxy DPM job, you may want to consider our Epoxy DPM 5kg Tins.
Installing an Epoxy DPM
Epoxy DPM Multi Chamber Bag Mixing Instructions
Start by making sure the mixing surface is clean and free from sharp objects that could pierce the bag. Open the outer silver packaging along the perforation and remove the transparent multi-chamber bag.
Lay the bag out and pull the rubber dividing strip away from its plastic holder. This allows both liquid sections to flow freely into each other.
Important Note: Once this process has started the Epoxy DPM must be laid onto the concrete within 10 - 25 minutes depending on substrate and air temperature. The warmer the temperature the quicker the product will start to go off.
Mix the two components together by kneading the contents of the bag intensively for at least of 60 seconds. Don’t exert too much pressure on the bag to prevent it from bursting. A uniform resin should be achieved. Make sure both colour liquids mix evenly and there are no streaks. Remove the screw cap and tamper proof ring from the bag.
Pour the contents of the bag into a suitable container / roller tray or directly onto the substrate ready to be spread.
Alternative Mixing Instructions - Remove the rubber dividing strip and pour the entire contents of the bag into a suitable container and mix the contents using a slow speed electric mixer. Mix for at least 2 minutes. The Epoxy DPM is now ready to be applied to the substrate.
 
 
Epoxy DPM Application
Epoxy Damp Proof Membrane is always installed in a minimum of two coats 24 - 48 hours apart. For floors with a high RH Reading above 92% three coats are required. Once mixed the product has a usable life of approximately 10-25 minutes max depending on site conditions. Past this point the product cannot be used for further coats.
Epoxy Damp Proof Membrane is applied at 200 micron thickness (0.2mm) per coat. Although the epoxy will tolerate slight variations to this, we would not advise that it is applied above 0.5mm thickness as this could result in bubbling and curing issues.Liquid Epoxy Damp Proof Membrane dries clear, if you require a coloured finish we recommend 2 coats of Epoxy Resin Floor Coating after Liquid Epoxy Damp Proof Membrane has been installed.
If you wish to lay tiles or adhere any further coatings including self levelling compounds on top of this coating we advise that you blind the final coat of Liquid Epoxy Damp Proof Membrane with Fine Quartz Aggregate 30 minutes after laying the coat to provide a key for the tile adhesive or grout to bond to.

Permagard – Providing Solutions. Inspiring Confidence.
If you need any technical advice on epoxy flooring or laying an epoxy DPM then give our expert team a call on 0117 982 3282.

Visit Product Page
Bought the Damp proof liquid from Permaguard to apply on top of an existing concrete ground bearing slab. Since the slab was over 30 years old with a very thin polythene membrane beneath of questionable quality. The permaguard dmp two part liquid works really well, forming a nice crisp seal to the concrete. Which we then insulated and screened over.
Helpful Report
Posted 3 days ago
This was quite sticky but fine to apply using a roller and a brush. Applied around the edges using a brush and then a roller with long handle for the main floor. My wife helped and tipped the DPM on the floor as I worked with the roller. It worked well and we had enough time to cover a garage floor approx. 17 m sq. We applied two coats.
Helpful Report
Posted 3 weeks ago
STEPHEN DENTON
Verified Reviewer
Great product Easy to work with Not sure about the two bag system compared to a two tin system
Helpful Report
Posted 1 year ago
Great product would recommend this to anyone having the same problem as us.
Helpful Report
Posted 1 year ago
Excellent product
Helpful Report
Posted 1 year ago
Michael Strange
Verified Reviewer
The first layer was easy to apply by roller and but the second layer presented a problem; it was almost impossible to see if I had missed anywhere being the same colour. When I threw the quartz around all looked good. However, when I swept the quartz up it became evident that I had missed four small areas with the second coat. Permagard please make a different colour that can be purchased for the second coat. Also. please change the time between coats on either your website or on the Epoxy outer foil packaging as the site says 24 to 48 hours but instructions on the foil has 6 to 24 hours.
Helpful Report
Posted 2 years ago
Second time I have used Permagard epoxy resin on concrete floors and again it did a great job! I wish it took a bit longer to go off, I used a brush for the edges and roller for the rest but only just finished before the roller was sticking to the floor and I was pretty fast. Great product though and great service so wouldn’t buy from anywhere else.
Helpful Report
Posted 2 years ago
Stephen Greenhow
Verified Reviewer
Easy to follow instructions. Easy to apply Great product.
Helpful Report
Posted 2 years ago