Installation was rushed by your operative "Frank". The installation around the meter area is ugly and I'm not sure it meets the requisite regulations. The mains splitter/terminal box is mounted directly to the wall along with your cutout. Normally I would have expected these devices to be mounted on a separate meter board.
All the meter seals have been removed and I assume I've now got to get EDF to replace them.